Construction of 170 Ton Post Tensioned bridges containing Cut and fill 14000 M3 Soil, Piles, Foundations, Structure Framing, Post tensioned precast beams with bearing systems, approached slabs with construction joints, handrails, platforms and keystone wing walls. Bridge spans 40 m with extended ramps.